濟(jì)南電纜橋架設(shè)計(jì)安裝標(biāo)準(zhǔn)和施工要求

  結(jié)合《建筑電氣工程施工質(zhì)量驗(yàn)收規(guī)范》和《民用建筑電氣設(shè)計(jì)規(guī)范》等現(xiàn)行標(biāo)準(zhǔn)及工程實(shí)踐,整理歸納的電纜橋架安裝技術(shù)和設(shè)計(jì)要點(diǎn),如下:

  Based on current standards and engineering practices such as the "Code for Acceptance of Construction Quality of Building Electrical Engineering" and the "Code for Electrical Design of Civil Buildings", the cable tray installation technology and design points are summarized as follows:base64_image

  一、間距要求電纜橋架在穿過(guò)防火墻及防火樓板時(shí),應(yīng)采取防火隔離措施,防止火災(zāi)沿線(xiàn)路延燃;防火隔離墻、板,應(yīng)配合土建施工預(yù)留洞口,在洞口處預(yù)埋好護(hù)邊角鋼,施工時(shí)根據(jù)電纜敷設(shè)的層數(shù)和根數(shù)用L50×50×5角鋼作固定框,同時(shí)將固定柜焊在護(hù)邊角鋼上;也可以先作好框在土建施工中砌體或澆灌混凝土?xí)r安裝在墻、板中。

  1、 The safety distance requirement is that when cable trays pass through firewalls and fire-resistant floors, fire-resistant isolation measures should be taken to prevent fires from spreading along the line; Fire isolation walls and panels should be equipped with reserved openings for civil construction, and edge protection angle steel should be pre embedded at the openings. During construction, L50 × 50 × 5 angle steel should be used as a fixed frame according to the number of layers and cables laid, and the fixed cabinet should be welded to the edge protection angle steel; Alternatively, the frame can be installed in the wall or slab during masonry or concrete pouring in civil construction.

  注:與可燃管道交叉時(shí)凈距≥100mm;間距不足時(shí)需采用石棉板、防火隔板等隔離措施。

  Note: When crossing with combustible pipelines, the clear distance should be ≥ 100mm; if the distance is insufficient, isolation measures such as asbestos board and fireproof partition should be used.

  二、接地與連接規(guī)范橋架安裝選擇

  2、 Grounding and connection specifications - Bridge installation selection

  需屏蔽電氣干擾的電纜回路,有腐蝕的場(chǎng)所、易燃粉塵場(chǎng)所,應(yīng)選用無(wú)孔封閉型托盤(pán);在容易積灰和其它需遮蓋的環(huán)境或戶(hù)外場(chǎng)所,宜帶有蓋板。低壓電力電纜與控制電纜共用同一托盤(pán)或梯架時(shí),應(yīng)選用中間有隔板的托盤(pán)或梯架;在托盤(pán)、梯架分支、引上、引下處應(yīng)設(shè)適當(dāng)?shù)膹澩ǎ灰蚴芸臻g條件限制不便裝設(shè)彎通或有特殊要求時(shí),可選用軟連接板、鉸接板;伸縮縫應(yīng)設(shè)置伸縮板;連接兩段不同寬度或高度的托盤(pán)、梯架可配置變寬或變高板。

  Cable circuits that require shielding from electrical interference, places with corrosion, and places with flammable dust should use non porous enclosed trays; In environments or outdoor places that are prone to dust accumulation and require cover, it is advisable to have a cover plate. When low-voltage power cables and control cables share the same tray or ladder, a tray or ladder with a partition in the middle should be selected; Appropriate bends should be installed at the branching, leading up, and leading down points of pallets and ladders; When it is inconvenient to install bends due to space constraints or there are special requirements, soft connecting plates or hinged plates can be used; Expansion joints should be equipped with expansion plates; Connecting two trays or ladders of different widths or heights can be configured with variable width or height boards.

  1.接地要求:金屬橋架及支架全長(zhǎng)≥2處接地(與PE/PEN干線(xiàn)連接)。非鍍鋅橋架連接板兩端跨接≥4mm?銅芯接地線(xiàn)。鍍鋅橋架連接板兩端用≥2個(gè)防松螺栓固定(無(wú)需跨接線(xiàn))。

  1. Grounding requirements: Metal cable trays and supports must be grounded at least 2 points along their entire length (connected to PE/PEN main lines). Both ends of the non galvanized bridge connecting plate should be bridged with a copper core grounding wire of ≥ 4mm. The two ends of the galvanized bridge connecting plate are fixed with ≥ 2 anti loosening bolts (no need for jumper wires).

  2.橋架選型:場(chǎng)景橋架類(lèi)型屏蔽干擾/腐蝕環(huán)境無(wú)蓋無(wú)孔封閉托盤(pán)積灰/戶(hù)外環(huán)境帶蓋板槽式橋架電力+控制電纜共用中間帶隔板的托盤(pán)/梯架空間受限/特殊走向設(shè)軟連接板、鉸接板伸縮縫處理設(shè)伸縮板(金屬橋架每50m設(shè)20-30mm)

  2. Cable tray selection: Recommended scenario: Cable tray type: Shielding interference/Corrosive environment without cover or hole, enclosed tray with dust accumulation/Outdoor environment with cover plate, trough type cable tray with power and control cable sharing, tray with partition in the middle, ladder rack with limited space/Special direction, flexible connection plate, hinged plate, expansion joint treatment, expansion plate (metal cable tray with 20-30mm every 50m)

  三、安裝工藝標(biāo)準(zhǔn)

  3、 Installation process standards

  電纜橋架處如有防火要求的場(chǎng)所,應(yīng)采取防火隔離措施。電纜敷設(shè)嚴(yán)禁有絞擰、鎧裝壓扁、護(hù)層斷裂和表面嚴(yán)重劃傷等缺陷。電纜橋架安裝工藝流程:定位放線(xiàn)→預(yù)埋鐵件或膨脹螺栓→支、吊、托架安裝→橋架安裝→保護(hù)接地安裝。

  If there are fire prevention requirements at the cable tray location, fire isolation measures should be taken. Cable laying must strictly prohibit defects such as twisting, flattening of armor, breakage of protective layer, and severe surface scratches. Installation process of cable tray: positioning and laying out → pre embedded iron parts or expansion bolts → installation of supports, hangers, and brackets → installation of cable tray → installation of protective grounding.

  1. 支架安裝預(yù)埋件自制加工件≥120mm×80mm×6mm,錨固圓鋼≥Φ10mm。支/吊架規(guī)格扁鋼≥30mm×3mm,角鋼≥25mm×25mm×3mm。當(dāng)橋架寬度<300mm時(shí),應(yīng)在距非直線(xiàn)段與直線(xiàn)結(jié)合處300-600m的直線(xiàn)段側(cè)設(shè)置一個(gè)支、吊架。當(dāng)橋架寬度>300mm時(shí),在非直線(xiàn)段中部還應(yīng)增設(shè)一個(gè)支、吊架。固定間距水平敷設(shè)1.5~3m;垂直敷設(shè)≤2m。轉(zhuǎn)彎、接線(xiàn)盒、變形縫兩端500mm內(nèi)需增設(shè)支點(diǎn)。戶(hù)內(nèi)支、吊短跨距一般采取1.5-3m。戶(hù)外立柱中跨距一般采取6m。多層橋架間距拉擠玻璃鋼電纜橋架多層設(shè)置時(shí),層間中心距為200,250,300,350mm。金屬橋架直線(xiàn)段每隔50m應(yīng)予留伸縮縫20-30mm(安裝伸縮板及跨接地線(xiàn))。注:橋架與支架間螺栓、橋架連接板螺栓緊固無(wú)遺漏,螺母位于橋架外側(cè)。

  1. The installation of bracket embedded parts and self-made processed parts should be ≥ 120mm × 80mm × 6mm, and the anchoring round steel should be ≥ Φ 10mm. The specifications of the support/hanger are flat steel ≥ 30mm × 3mm and angle steel ≥ 25mm × 25mm × 3mm. When the width of the bridge is less than 300mm, a support/hanger should be installed on the side of the straight section 300-600m away from the junction of the non-linear section and the straight section. When the width of the bridge is greater than 300mm, an additional support or hanger should be added in the middle of the non-linear section. Horizontal laying with fixed spacing of 1.5-3m; vertical laying ≤ 2m. Additional support points need to be added within 500mm at both ends of bends, junction boxes, and deformation joints. The short span for indoor support and suspension is generally 1.5-3m. The span for outdoor columns is generally 6m. When multiple layers of fiberglass cable trays are installed, the center distance between layers is 200250300350mm. Expansion joints of 20-30mm should be left every 50m for straight sections of metal trays (installation of expansion plates and grounding wires). Note: The bolts between the bridge and the bracket, as well as the bolts of the bridge connecting plate, are tightened without omission, and the nuts are located on the outside of the bridge.

  2. 橋架敷設(shè)項(xiàng)目要求水平敷設(shè)支撐跨距1.5~3m;坡度≥1/100(室外進(jìn)室內(nèi))垂直敷設(shè)纜線(xiàn)每1.5m固定一次彎曲段支撐彎曲半徑≤300mm時(shí),距彎頭300~600mm設(shè)支點(diǎn);>300mm時(shí)彎通中部增設(shè)支點(diǎn)多層橋架層間距:200/250/300/350mm(玻璃鋼橋架)填充率橫斷面≤50%;吊頂內(nèi)槽蓋開(kāi)啟面凈空≥80mm綁扎要求水平/垂直段需綁扎;24根4對(duì)線(xiàn)為1束;綁扎間距≤1.5m注:當(dāng)鋁合金橋架與鋼支架固定時(shí),有相互間絕緣防電化措施腐蝕措施,一般可墊石棉墊。電纜橋架在電氣豎井內(nèi)敷設(shè),可采用角鋼固定。

  2. The bridge laying project requires horizontal laying with a support span of 1.5~3m; for vertical laying of cables with a slope of ≥ 1/100 (outdoor to indoor), a bending section is fixed every 1.5m to support the bending radius ≤ 300mm. When the bending radius is ≤ 300mm, a fulcrum is set at a distance of 300~600mm from the elbow; When the distance between the layers of the multi-layer bridge with a pivot point added in the middle of the bend is greater than 300mm: 200/250/300/350mm (fiberglass bridge) filling rate, cross-sectional area ≤ 50%; The clear clearance of the opening surface of the groove cover in the ceiling should be ≥ 80mm, and the horizontal/vertical sections should be tied; 24 pairs of wires form one bundle; Binding spacing ≤ 1.5m Note: When the aluminum alloy bridge is fixed to the steel bracket, there are mutual insulation and corrosion prevention measures, and asbestos pads can generally be used. The cable tray is laid in the electrical shaft and can be fixed with angle steel.

  3. 特殊節(jié)點(diǎn)處理伸縮節(jié)鋼橋架>30m、鋁合金/玻璃鋼橋架>15m時(shí)設(shè)置。跨越伸縮縫處設(shè)置補(bǔ)償裝置,可用帶伸縮節(jié)的橋架。防火隔離穿越防火墻/樓板時(shí),用防火包/防火泥封堵洞口(配合L50×50×5角鋼框架)。設(shè)備交叉橋架與用電設(shè)備凈距≥0.5m;同高度平行橋架間距≥0.6m。注:敷設(shè)在豎井內(nèi)和穿越不同防火區(qū)的橋架,應(yīng)有防火隔離措施。

  3. Special node processing shall be set for expansion joint steel bridge>30m and aluminum alloy/fiberglass bridge>15m. Set up compensation devices at the expansion joints, and use cable trays with expansion joints. When passing through firewalls/floors for fire isolation, seal the openings with fireproof bags/fireproof mud (in conjunction with L50 × 50 × 5 angle steel frame). The clear distance between the cross bridge of equipment and the electrical equipment is ≥ 0.5m; the distance between parallel bridge bridges at the same height is ≥ 0.6m. Note: Bridge bridges laid in vertical shafts and crossing different fire zones should have fire isolation measures.

  四、質(zhì)量驗(yàn)收強(qiáng)制性要求

  4、 Mandatory requirements for quality acceptance

  (1)槽式大跨距電纜橋架由室外進(jìn)入建筑物內(nèi)時(shí),橋架向外的坡度不得小于1/100。

  (1) When the trough type large-span cable tray enters the building from the outside, the outward slope of the tray shall not be less than 1/100.

  (2)電纜橋架與用電設(shè)備交越時(shí),其間的凈距不小于0.5m。鋁合金橋架與鋼支架間需絕緣(如墊石棉墊;禁用石棉地區(qū)可改用陶瓷纖維墊)。

  (2) When the cable tray intersects with electrical equipment, the clear distance between them should not be less than 0.5m. The aluminum alloy tray and steel support should be insulated (such as with asbestos pads; ceramic fiber pads can be used in areas where asbestos is prohibited).

  (3)兩組電纜橋架在同一高度平行敷設(shè)時(shí),其間凈距不小于0.6m。

  (3) When two sets of cable trays are laid parallel at the same height, the clear distance between them should not be less than 0.6m.

  (4)電纜橋架宜高出地面2.2米以上,橋架頂部距頂棚或其它障礙物不應(yīng)小于0.3米,橋架寬度不宜小于0.1米。橋架內(nèi)橫斷面的填充率不應(yīng)超過(guò)40%,控制電纜可放寬到50%。

  (4) The cable tray should be at least 2.2 meters above the ground, and the distance between the top of the tray and the ceiling or other obstacles should not be less than 0.3 meters. The width of the tray should not be less than 0.1 meters. The filling rate of the cross-section inside the bridge should not exceed 40%, and the control cable can be relaxed to 50%.

  (5)電纜橋架內(nèi)纜線(xiàn)垂直敷設(shè)時(shí),在纜線(xiàn)的上端和每間隔1.5米處應(yīng)固定在橋架的支架上;水平敷設(shè)時(shí), 在纜線(xiàn)的首、尾、轉(zhuǎn)彎及每間隔3~5米處進(jìn)行固定。

  (5) When the cables are vertically laid in the cable tray, they should be fixed on the brackets of the tray at the upper end and every 1.5 meters; When laying horizontally, fix the cable at the beginning, end, turn, and every 3-5 meters.

  (6)在吊頂內(nèi)設(shè)置時(shí),槽蓋開(kāi)啟面應(yīng)保持80毫米的垂直凈空,線(xiàn)槽截面利用率不應(yīng)超過(guò)50%。

  (6) When installed in the ceiling, the opening surface of the trough cover should maintain a vertical clearance of 80 millimeters, and the utilization rate of the trough section should not exceed 50%.

  (7)布放在線(xiàn)槽的纜線(xiàn)可以不綁扎,槽內(nèi)纜線(xiàn)應(yīng)順直,盡量不交叉;纜線(xiàn)不應(yīng)溢出線(xiàn)槽;在纜線(xiàn)進(jìn)出線(xiàn)槽部位, 轉(zhuǎn)彎處應(yīng)綁扎固定。垂直線(xiàn)槽布放纜線(xiàn)應(yīng)每間隔1.5米固定在纜線(xiàn)支架上。

  (7) The cables laid in the cable trough can be left unbound, and the cables inside the trough should be straight and avoid crossing as much as possible; Cables should not overflow from cable trays; At the entrance and exit of the cable tray, the turning points should be tied and fixed. The cables laid in the vertical cable tray should be fixed on the cable support every 1.5 meters.

  (8)在水平、垂直橋架和垂直線(xiàn)槽中敷設(shè)線(xiàn)時(shí),應(yīng)對(duì)纜線(xiàn)進(jìn)行綁扎。綁扎間距不宜大于1.5米,扣間距應(yīng)均勻,松緊適度。

  (8) When laying wires in horizontal and vertical cable trays and vertical trunking, the cables should be tied. The binding spacing should not exceed 1.5 meters, the buckle spacing should be uniform, and the tightness should be moderate.

  (9)橋架水平敷設(shè)時(shí),支撐間距一般為1.5-3m,垂直敷設(shè)時(shí)固定在建筑物構(gòu)體上的間距宜小于2m。

  (9) When laying the bridge horizontally, the support spacing is generally 1.5-3m, and when laying vertically, the spacing fixed on the building structure should be less than 2m.

  (10)橋架不得出現(xiàn)絞擰、壓扁、護(hù)層斷裂或深度劃傷。

  (10) The bridge frame shall not have twisting, flattening, broken protective layer or deep scratches.

  (11)螺栓緊固無(wú)遺漏,螺母位于橋架外側(cè)。(12)接地連接可靠,導(dǎo)通電阻≤0.1Ω。

  (11) The bolts are tightened without omission, and the nuts are located on the outside of the bridge. (12) The grounding connection is reliable, with a conduction resistance of ≤ 0.1 Ω.

  本文由  濟(jì)南電纜橋架 友情奉獻(xiàn).更多有關(guān)的知識(shí)請(qǐng)點(diǎn)擊  http://m.12xw.com/  真誠(chéng)的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識(shí)我們將會(huì)陸續(xù)向大家奉獻(xiàn).敬請(qǐng)期待.

  This article is a friendly contribution from Jinan Cable Bridge For more related knowledge, please click http://m.12xw.com/ Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.

 
qq
售前咨詢(xún)熱線(xiàn)
15168870138
售后咨詢(xún)熱線(xiàn)
13465410318
日韩欧乱色一区二区三区在线_国产精品视频免费观看_99视频有精品_欧美日韩精品一区二区天天拍小说
国产一区亚洲一区| 精品二区视频| 欧美日韩大片| 亚洲第一黄色网| 在线日韩电影| 欧美一区二区日韩一区二区| 欧美一区二区啪啪| 亚洲视频在线观看免费| 久久精品国产一区二区三区| 欧美gay视频| 激情国产一区| 亚洲影视在线| 欧美视频福利| 国内成人精品2018免费看| 1000部精品久久久久久久久| 樱花yy私人影院亚洲| 激情91久久| 国产精品海角社区在线观看| 亚洲日本无吗高清不卡| 亚洲午夜精品视频| 欧美日本国产| 亚洲欧美精品伊人久久| 国产视频亚洲精品| 蜜臀va亚洲va欧美va天堂| 一区二区三区成人精品| 久久精品国产亚洲aⅴ| 伊人久久综合97精品| 亚洲人人精品| 欧美在线999| 一区久久精品| 欧美精品亚洲| 好吊日精品视频| 亚洲欧美一区二区三区极速播放 | 欧美国产日韩视频| 国产精品海角社区在线观看| 影音先锋一区| 午夜精品一区二区三区电影天堂 | 国内精品久久久久影院优| 一区二区三区高清| 欧美成人精品1314www| 国产精品影音先锋| 亚洲免费观看| 久久香蕉精品| 国产欧美日韩另类视频免费观看| 亚洲卡通欧美制服中文| 久久全国免费视频| 国产无遮挡一区二区三区毛片日本| 日韩午夜免费| 欧美大成色www永久网站婷| 国产日韩精品一区二区三区在线 | 一本综合精品| 欧美激情91| 雨宫琴音一区二区在线| 欧美一区二区三区电影在线观看| 欧美日韩一区二区精品| 亚洲精品免费网站| 暖暖成人免费视频| 在线观看91精品国产入口| 久久国产高清| 国产情人综合久久777777| 亚洲欧美国产一区二区三区| 欧美日韩专区| 99热免费精品| 欧美精品aa| 最新中文字幕一区二区三区| 榴莲视频成人在线观看| 黄色亚洲在线| 久久精品天堂| 国产综合激情| 久久精品免费观看| 国产三级精品三级| 午夜精品久久久久久久久久久久| 欧美午夜无遮挡| 亚洲天堂av电影| 国产精品mm| 亚洲一区二区在线视频| 国产精品成人播放| 亚洲天堂视频在线观看| 欧美色网一区二区| 中文在线资源观看网站视频免费不卡| 欧美日本亚洲| 9久草视频在线视频精品| 欧美精品一区在线| 99视频一区| 欧美日韩在线影院| 亚洲视频免费观看| 国产精品草草| 亚洲欧美激情四射在线日| 国产精品视频区| 国产三级精品在线不卡| 欧美在线播放一区二区| 国产一区二区无遮挡| 久久激情综合网| 韩国一区二区三区在线观看| 久久久久一区二区三区| 精品不卡在线| 欧美成人精品一区| 亚洲美女av在线播放| 欧美日韩在线观看一区二区| 亚洲视频在线观看视频| 国产精品免费久久久久久| 欧美一区二区视频免费观看| 狠狠色综合日日| 欧美77777| 99riav国产精品| 国产精品欧美风情| 久久精品欧美日韩精品| 亚洲大胆人体视频| 欧美日本三区| 性欧美video另类hd性玩具| 国产一区二区三区高清在线观看| 久久久亚洲高清| 黄色亚洲在线| 欧美国产欧美亚洲国产日韩mv天天看完整 | 国产精品久久久一区二区| 欧美一区深夜视频| 亚洲第一区中文99精品| 欧美日韩国产综合视频在线| 亚洲男人影院| 尤物网精品视频| 欧美日韩免费高清| 欧美在线播放一区| 亚洲国产99精品国自产| 欧美视频在线播放| 久久国产精品毛片| 亚洲精选在线| 国产一区二区三区最好精华液| 久久综合九色| 亚洲亚洲精品在线观看| 一区在线观看视频| 欧美性大战久久久久久久| 久久久久久久精| av成人黄色| 国内精品美女在线观看| 欧美日韩一级视频| 久久一区精品| 亚洲欧美福利一区二区| 亚洲黄色高清| 国产欧美精品在线观看| 欧美黑人在线播放| 久久aⅴ国产紧身牛仔裤| 99综合在线| 在线观看欧美亚洲| 国产精品免费看片| 欧美高清视频一二三区| 欧美一区二区视频观看视频| 亚洲精品日韩久久| 国内激情久久| 欧美亚一区二区| 暖暖成人免费视频| 欧美在线中文字幕| 一卡二卡3卡四卡高清精品视频| 好吊日精品视频| 国产精品综合不卡av | 亚洲福利在线看| 国产欧美日韩在线观看| 欧美日韩成人精品| 另类欧美日韩国产在线| 香蕉久久国产| 一区二区三区产品免费精品久久75| 在线观看欧美日韩国产| 国产午夜精品福利| 欧美日韩精品久久久| 美女精品在线观看| 久久不射中文字幕| 亚洲自拍偷拍一区| 9久草视频在线视频精品| 亚洲国产精品999| 韩国福利一区| 国产日本精品| 国产精品美女久久久久久久| 欧美美女操人视频| 欧美大片免费久久精品三p | 久久久精品久久久久| 亚洲欧美日韩在线播放| 9l国产精品久久久久麻豆| 亚洲丰满在线| 樱桃视频在线观看一区| 黄色亚洲精品| 国产一区二区三区在线免费观看| 国产精品一区二区久久精品| 欧美午夜视频网站| 欧美日韩黄色一区二区| 欧美国产视频在线| 男人插女人欧美| 老司机一区二区三区| 久久久久久久激情视频| 欧美在线观看www| 午夜精品久久久久久久99樱桃| 亚洲无毛电影| 在线综合欧美| 一区二区三区毛片| 在线午夜精品| 中国成人黄色视屏| 亚洲视频电影在线| 亚洲视频久久| 亚洲曰本av电影| 亚洲在线视频| 亚洲欧美日韩精品久久久| 亚洲综合社区| 亚洲欧美日韩成人| 性高湖久久久久久久久| 欧美一级精品大片| 午夜在线不卡|